Introduction:
A leading solar energy company in East Africa aimed to develop a 50 MW solar PV power plant to supply renewable energy to the local grid.
Challenges:
Remote Location: Extensive transmission lines were needed to connect the solar plant to the main grid.
Durability: The infrastructure had to withstand harsh environmental conditions.
Efficiency: Minimizing energy loss during transmission was crucial.
LX CABLE’s Solution:
High-Quality Cables: We supplied transmission cables designed for the 50 MW solar plant, ensuring superior conductivity and durability.
Power Fittings and Insulators: Provided secure and stable connections with suspension and tension clamps, built to endure harsh conditions.
Comprehensive Components: Supplied grounding systems, разъемы, and lightning protection to ensure safety and reliability.
Implementation:
Design and Coordination: Collaborated with the client’s engineering team to design the transmission system, selecting appropriate components.
Timely Delivery: Ensured all components were delivered on schedule, despite the remote location.
Technical Support: Offered guidance throughout installation to ensure optimal performance.
Results:
Reliable Transmission: Ensured efficient and reliable power delivery with minimal energy loss.
Durability: Built to withstand environmental conditions, requiring minimal maintenance.
Enhanced Energy Access: Facilitated efficient transmission of solar power, supporting local development and sustainability.
Узнайте, как LX Cable может поддержать ваш следующий PV -проект или другие проекты передачи электроэнергии с помощью нашего комплексного ассортимента продуктов и услуг.