LX CABLE's BOMFLEX Service

A solution from BOM list to site delivery.

Lar

>

Solução de uma parada

Do You Face These Cable Procurement Challenges?

  1. Local procurement is too expensive?
  2. Have problem in managing too many oversea suppliers?
  3. Have trust problem with new suppliers?
  4. Need faster delivery?
  5. Need a hub for shipment consolidation?

What is BOMFLEX?

BOMFLEX is a BOM procurement & management service developed by LX Cable. This service is to wrap the complex issues which happens during a project procurement from China, into a simple and agile solution package.

BOMFLEX is now focusing on serving Solar, Power and Telecom Projects.

What is Included?

  • Fabricação de Cabos & Acessórios a cabo
  • Aquisição de itens com base na lista BOM do projeto
  • Consolidação de Itens no armazém LX
  • Reembalagem & Otimização de carregamento de contêineres
  • Inspeção de remessa padronizada
  • Gerenciamento de entrega de remessa para porta/site de destino
  • Garantia e serviço pós -venda

MAIN ITEMS COVERED

  • Cabos & Cable connection
  • Hardware
  • Cable Ducting and Trays
  • Lighting protection and Grounding Materials
  • Overhead Powerline Accessories
  • End-customer Connection and Drop line Accessories
  • Ferramentas

Why BOMFLEX?

BOMFLEX Service has been Verified by the market and Acknowledged by our customers for 5 anos.

cost saving
fast delivery
customs clearance
Entrega confiável
Suporte de equipe

1. Economia de custos

Comparando com as compras no local, Bomflex Ajuda nosso cliente salva 30% do orçamento total deles.

Por que somos capazes de fazer isso???
(1) LX Group possuía sua fábrica de cabo, que podem fabricar cabos e acessórios de cabo por si só
(2) Tem uma base de fornecedores muito confiável no local, que foi desenvolvida há anos
(3) Tem um sistema muito eficiente para minimizar o custo de transporte local durante a consolidação de itens

2. Delildio rápido

Após otimização contínua e iteração, Estamos cortando o tempo de entrega pela metade. Agora somos capazes de gerenciar remessas prontas para entrega:
Dentro de 2 Semanas para um projeto solar de micro grade padrão (<1MW)
Dentro de 3 Semanas para um pequeno projeto solar (< 5mw)

3. MOQ baixo

Graças a um sistema de controle de estoque bem desenvolvido que se conecta ao nosso departamento de produção de cabos e fornecedores de acessórios, BOMFLEX agora suporta MOQ muito baixo para projetos menores.

4. Entrega confiável

10+ elétrico & engenheiros de qualidade em uma equipe de suporte técnico, fornece garantia de qualidade confiável
Processo interno padronizado de CQI
Embalagem Padronizada & Rótulo
Política de garantia de pelo menos um ano

5.Suporte de equipe

Temos um departamento independente, incluindo gerentes de projeto e técnicos experientes para apoiá-lo
Orçamento rápido
Confirmação técnica clara e detalhada
Transparente, comunicação ágil e oportuna

Proven Expertise Through Real-World Cable Projects

Discover how our extensive experience in cable projects has delivered reliable solutions, overcoming procurement challenges and ensuring quality and efficiency in every step.

Solar Power Plant

Solar Power Plant

Project Name: RREP Project l&

Project Scale: Solar Mini Grid

Material Supplied: LV/DC Cables/Distribution Materials/Tools

Year of Supplied: 2023

Location: Sierra Leon

Description: The project was developed in 2 Phases, when we received the PO of the 1st Phase, customer required us to deliver within 14 days for 50+ items, which is quite challenging.

The LX team immediately took the task. With the great effort and also due to high efficiency of the system, we finally get all materials ready within 10 days.

Now we have delivered all material for 2 Phases, and according to feedback from commissioning of the 1st Phase, customer is happy with the service.

Transmission Line Upgrade

Transmission Line Upgrade

Project Name: Bamburi Cement Project

Project Scale: Solar farm for Industry

Material Supplied: MV/LV/DC Cables/Cable Connectors/Earthing Materials

Year of Supplied: 2024

Location: Kenya

Description: The biggest challenge of this project was unexpected cost increase on raw material price & ocean freight.

LX signed the contract of the project in April, when copper/aluminum price in global metal market was experiencing historical shock by a 20% increase. This shock had significant impact on cost of the cables & accessories we were going to supply. What made it more challenging is before shipment, ocean freight had almost doubled.

However we took the challenge. Thanks to the great support of the management team and also the good relationship between LX and our reliable material suppliers, we got the best resources to be able to execute this contract without delay.

This case shows our ability to fight against potential risk in cost, which is essential to projects and tenders.

Get in Touch with Us

Discover how LX CABLE can support your next PV project or other power transmission projects with our comprehensive range of products and services.

Contate-nos